GREENHOU S E SGRANDIOGREENHOUSE USER MANUAL© 2013 Grandio Greenhouses, Backyard Living Source Inc. All rights reserved2015 Manual Edition Extendable G
OutdoorGround Assembly BA-A1 must be buried in ground.Dig holes to bury the BA-A1’s, you determine size and depth for your location.BASE KIT ASSEMBLY
10STEP TWOFRONT FRAME ASSEMBLY INSTRUCTIONSALWAYS ASSEMBLE FRONT HORIZONTALGRANDIOTIPLay at on ground to assemble the front frame of your greenhouse.
11STEP TWO2.1 Prethread all S05 screws into the WG01 and WG02’s for ease of installation, see only turn S05 a few turns. 2.2 Use WG01 bracket t
12STEP TWO2.4 Insert polycarbonate panels Y3-2 and Y3-1 into place as shown in . 2.5 Attach 603E and 603D with W04 and S04/ML01 fasteners
13STEP TWO2.7 View diagrams and attach the (2) 604’s and (2) 601A’s to the 619. Note the orientation of the 604’s, there are 4 dierent 601A’s (2) for
14STEP TWOPolycarbonate panel606-WS619GRANDIOTIPTransparent FilmOutside GreenhouseOpal White FilmInside GreenhousePolycarbonate PanelSunInside ViewY1Y
2.12 Move roof and front section together and align the WG02’s into the 601A’s, and the W04-2’s into the 604’s. Insure a snug t between the WG02’s, 6
16STEP THREEBACK ASSEMBLY INSTRUCTIONSALWAYS ASSEMBLE BACK HORIZONTALGRANDIOTIPBOLT INSTALLATION TIP: Locate all nuts and bolts, pre thread and place
17STEP THREE3.1 Prethread all S05 screws into the WG01 and WG02, see . 3.2 Use the WG01 bracket to attach the (2) 601B’s together, secure part
Y1Y1Y1Y1601A-B601A-BL08A602C602D 602D3.4 Attach (2) 601A-B’s to L08A using S04/ML01 fastener as shown in diagram .Attach (2) 602D’s to L08A usin
GREENHOU S E SGRANDIOBefore you begin take time to complete this check list. Take inventory of all parts using the parts list at the back of this manu
19STEP THREEY1Y1Y1Y1601A-B601A-B602C602D 602DY4-1Y5-1Y5-2Y4-23.7 Set (4) 603C’s atop each Y-1 panel, then align the pre threaded S04-ML01 fasteners in
20STEP THREEInside View3.9 Pre thread the S05 screws on WG01, WG02’s and the S04/ML01 W04-2’s brackets and place into appropriate extrusion see
3.10A. Attach (2) L08B-X’s to (2) 602D’s and L08A with S04/ML01 as shown in .B. Attach (2) L08B-X’s to the (2) 601A-B’s with fasteners as shown
MIDDLE ASSEMBLY INSTRUCTIONS4.1 We recommend pre threading all (9) W05 Clips with the nut and bolt combos now. See , note the bolt head will alw
23STEP FOURMIDDLE ASSEMBLY CONTINUED601A601BL08A-XL08C-XL08DL08C-XBase4.3 Attach L08C-X to 601A and the BA-S2 with S04/ML01 on both sides as shown in
24STEP FOUR14.5 Have person (1) continue to hold the front vertically while the other attaches the font section to the base with W05/S04/ML01 fastener
25STEP FOURMIDDLE ASSEMBLY CONTINUED4.6 Attach back wall 601A’s with back base corners using S04/ML01 on both sides as shown in .4.7 Attach bott
MIDDLE ASSEMBLY CONTINUED4.9 With 2 people, attach the ridge to front and back by sliding into place as shown in and , using S04/ML01 fa
4.10 Before you attach the 609 you will need to loosen the ML01 (nut) attached to the tops of the L08C-X. Note: Loosen nuts on only one side at a time
GRANDIOTIPRemove only one L08C-X at a time. If all L08C-X’s are removed, the structure will collapse and cause unwarrantable damage.UP602B609Profile V
IMPORTANT! SAFETY INSTRUCTIONSFAILURE TO FOLLOW THESE WARNINGS MAY RESULT IN SERIOUS INJURY OR PROPERTY DAMAGE AND WILL VOID WARRANTY.To ensure safet
602AL08C-XS04ML01BA-S24.12 Before you attach the 602A’s to the sides of the greenhouse you will need to loosen the ML01 (nut) attached to the L08C-X a
30STEP FOURPolycarbonate Panel606BA-S2Outside4.13 Install plastic strip 606-WS before inserting polycarbonate sheet Y7’s, see . 4.14 After Y7’s
31STEP FOUR607601AL08C6094.15 Attach 602B’s to 609’s and 607’s as shown in diagram on both sides of the upper roof section. Note the exact plac
607601AY11Y11Y11Y11630609630602B602B609630602B602B609630609Y116094.16 Insert Y11 panels to upper roof section then slide the 630 into the groove of th
33STEP FOURSUN616615PC sheet4.17 Assemble the roof window vents as shown below in and , using the Z02 screws attach the 615, 616, and 61
4.19 After roof vents are positioned, attach all remaining 602B’s between the (2) 609’s as shown in the image and . MIDDLE ASSEMBLY CON
35STEP FOUR4.20 To ensure there is no gap in roof vent position 603C as shown in . Connect 603C to middle of 602B’s using W04 bracket as shown
36STEP FOUR609610GutterOutside View601B601A6104.19 Insert polycarbonate sheets Y8’s and Y9’s into the lower roof of your greenhouse. Panels may slide
JG03AZ0337STEP FOURJG02AJG01JG03BZ03JG02B4.21 Attach JG01, JG02A, JG02B, JG03A and JG03B end caps to the ridge, midroof and gutters on both front and
38STEP FIVEZ01622Y6Y6622-RUPUPDoubleBall Catch 620Z01Z01Z01Z01Z01623B623A622Side View622J08ABottomView623B620623AJ08AJ08A622-RUPUPSide View622J08ABott
PREPARE A FOUNDATION FOR YOUR GRANDIO GREENHOUSE38X8 GRANDIO ELITE BARN STYLE GREENHOUSE DIMENSIONS ROOF PEAK HEIGHT 1 3/4” GUTTERS 61”EAVE HEIGHTDOOR
39STEP FIVE623B623A622J08ABottomViewJ08AWe recommend you lay out all parts for both doors to make sure they match up correctly for hanging. Double che
J08A622J08ABottomViewSide ViewOf Top* DoubleBall Catch on the 622-L 622-LUPUPSide ViewOf Bottom5.4 Insert J08A into the bottom of the 622-R and 622-L,
1DOOR ASSEMBLYL21603D41STEP FIVE2Side Profile View of L21 Hanging TrackInside ViewTrackS02SCREWS025.7 Slide the (2) S02 bolts down the track of the L2
42STEP FIVES04S04S02 5.8 Separately slide the top of the doors in the left and right side of L21, see diagram , until they latch in the middle.
43STEP FIVEDOOR INSTALLATIONJ07603DL21L28S04/ML01Top LeftProfile View601AS02 L28 L28S02601AML015.10 Attach L28 to L21 with S04/ML01, and L28 to 601A
INTERIOR ROOF SUPPORT ASSEMBLY L08E-XL08D-XL08D-XCZ-1 CZ-1BZ-19” 9” L08D-XL08E-XBZ-1CZ-1602B 607609Roof Vent602B 601B 601B 6096096076.1 Attach the L
45601A-B601A-FL601A-FR601B602A602B602C602D-R602D-L603C603D603E619 PACKTHRESHOLD BARAND SCREW604-R 604-L607606-WS609610615616618630L08ANOTE THESE ARE P
46L08DL08A-XL08B-XL08C-XL08D-XL08E-XWG01WG02W04W04-1W04-2Z01Z0224 3/16 in / 614 mm52 1/4 in / 1327 mm51 3/16 in / 1300 mm61 1/32 in / 1550 mm37 13/16
47622-HNDL622-HNDLNUT/BOLT620L21J07622622-L622-R623A623BJ08AGRAPHIC PART NAME SIZE/LOCATION QUANTITY44212211224DOOR HANDLESD
48(GRA-ELI-8P) 8’x8’ ELITE PANEL BOX PACKING LISTY1Y2-1Y2-2Y3-1Y3-2Y4-1Y4-2Y5-1Y5-2Y6Y7Y8Y9Y10Y11FRONT & BACK PANELFRONT PANEL FRONT PANELFRONT PA
BACKFRONT620LEFT SIDE RIGHT SIDE4603CL08D603D601B601B620604-R601A-FL601A-FR601B601B619L08D603C603E602C602D 602D601B601B 601B601BL08B-X601A-BL08B603C60
72 3/16 in / 1833 mm BACK WALL 18 1/4 in / 463 mm BACK WALL70 3/4 in / 1797 mm FRONT RIGHT DOOR70 3/4 in / 1797 mm FRONT LEFT DOOR24 3/16 in / 614
Grandio Greenhouse Limited Lifetime Warranty1. Grandio Greenhouses are warranted to the original purchaser to be free from defects in material or work
GREENHOU S E SGRANDIOGREENHOUSE USER MANUALKEEP IN A SAFE PLACE FOR REFERENCECONTACT US IF YOU NEED HELPORHAVE MISSING OR DAMAGED PARTSGRANDIOGREENHOU
5 ASSEMBLY INSTRUCTION STEPSPREPARE FOR ASSEMBLYSTEP ONE: BASE ASSEMBLYSTEP TWO: FRONT ASSEMBLYSTEP THREE: BACK ASSEMBLYSTEP FOUR: MIDDLE ASSEMBLYSTEP
BASE KIT ASSEMBLY INSTRUCTIONS6STEP ONEPre-Plan The Placement Of Your StructureAllow enough room to get a wheel barrow in and around your structure. B
BASE KIT PARTS LIST FOR 8’X8’BA-S1BA-S2BA-C397 3/8 in / 2474 mm 94 1/4 in / 2394 mm5 7/16 in 138 mmGRAPHIC PART NAME SIZE/LOCATIO
Before you begin take time to complete this check list. Take inventory of all parts using the parts list at the back of this manual. Instruction for t
Comments to this Manuals